Hospital 12 de Octubre boiler supply


Category: Hospitals & Healthcare

Centro de Datos de Telefónica

Requirements and needs of the customer

The next project was building a technical building next to the Doce de Octubre Hospital (Madrid) to cover the needs of all general services regarding heating, sanitary hot water and steam generation.
The purpose was covering the Gas Oil supply needs of 6 heating boilers and 2 steam generators with mixed, modulating burners.
The installation would include 4 main gas oil tanks for the supply of their corresponding burners. The presence of a single pump system forced to plan an automatic suction protocol system via level probes.
On the other hand, modulating burners required pumping parameters in which flow, temperature and pressure were constant.

 